Click Here To View Another Inspection Inspection #: 333639 Inspection Type: Electrical Rough Inspector: D.Rooney Result: Partial Comment: Inspection for level 4 corridor ceiling and level 1 vault area. Requested by: Chris Stafford 830-2507 chriss2cold@gmail.com electrical approved - at light in 1st floor main corridor, 2 rooms in level 1 vault walls, level 4 corridor ceiling, note platform acceptable to meet working clearance requirements at basement east lift station (must be at least as big as required working clearance) Correction: 000 Electrical Rough Other Note: conduit must be sealed to prevent entry of water Inspection Corrections DateStatusCodeDescriptionRefLocationComments