Click Here To View Another Inspection Inspection #: 332306 Inspection Type: Final Structural Inspector: D.Blackburn Result: Approved Comment: Brace frame structural project at west end of Dimond Center. Mitch conducted previous inspection and per the last inspection report all that is required for final and certificate of completion is the SI closure letter. The closure letter was emailed to Jim Stubbs and Mitch Blackburn on 01/15/15. Please call Mike with MCN at 727-2269 with any questions. Thanks. Requested by: Mike Wood 907-727-2269 mikew@mcnconstruction.com Structural work approved for final. See summary letter from HDL sent to file. Inspection Corrections DateStatusCodeDescriptionRefLocationComments