Click Here To View Another Inspection Inspection #: 328212 Inspection Type: Ceiling Rough Electrical Inspector: D.Rooney Result: Correction Comment: 4th floor CVSU phase 3 Requested by: Bristol Beaujean 441-7346 bbeaujean@electricinc.net inspected phase 3 ceilings Correction: Correct Below Note: close ends of spare conduits from panels Correction: Correct Below Note: all abandoned cables must be removed, a cables must be supported off of ceiling grid, cables may not be taped to , ty-rapped to or lay on conduits for sprinkler pipes Correction: Correct Below Note: grid ceilings/lights not compete along temp walls Inspection Corrections DateStatusCodeDescriptionRefLocationComments