| Date | Status | Code | Description | Ref | Location | Comments |
| 9/30/2014 | Transfer | GasRgh14Piping | See comments | see comments | 1. 1/4" grade perr foot required on ABS pipe.2. hangers needed every 4 feet on ABS:3. Cannot cement in tie in, use connection fitting. 4. tie downs not installed. | 5. Furn and HWH not M.H. approved and duct not ran. 6 run gas to inside furn and retest gas.7 gas flex to be S.S. on range |