| Date | Status | Code | Description | Ref | Location | Comments |
| 8/1/2014 | Transfer | EF1 | Correct Below | | plans | provide updated plans showing changes to feeders, panels, additional loads and load calculations |
| 8/1/2014 | Transfer | EF1 | Correct Below | | plans | submit updated plans to MOA for approval |
| 8/1/2014 | Transfer | EF1 | Correct Below | | transformer | secondary side of transformer required main breaker or fused disconnect |
| 8/1/2014 | Transfer | EF1 | Correct Below | | transformer | install GEC for transformer, bond to both ends of raceways if in matal raceway |
| 8/1/2014 | Transfer | EF1 | Correct Below | | transformer primary breaker | plans call for 90 amp breaker (100 amp installed) |
| 8/1/2014 | Transfer | EF1 | Correct Below | | at future flagpole and scoreboard | bond raceways and j-box lids |
| 8/1/2014 | Transfer | EF1 | Correct Below | | under 480 volt panel | GEC run through metal raceway must be bonded at both ends or re-route outside of metal raceways |
| 8/1/2014 | Transfer | EF1 | Correct Below | | in 480 volt panel | separate equipment ground split bolted to grounding electrode conductor |