Click Here To View Another Inspection Inspection #: 310810 Inspection Type: Other Structural Inspector: H8 Result: Partial Comment: Pre-installation inspection of pile jackets. Contractor to begin installation at first low-tide, appx 5:00AM. To maximize number of jackets inspected, please schedule inspection as early as possible during regular business hours. Jackets staged on wharf at Terminal #3 between Trestles 2 and 3B. Requested by: Joshua Crowe 9079522206 jcrowe@rmconsult.com 6 EA. pile reinforcing jacket pre-install check. Material and fabrication conforns to job spec's, may install with SI approvals. Inspection Corrections DateStatusCodeDescriptionRefLocationComments