Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To View Another Inspection


Inspection #: 290784
Inspection Type: Final Structural
Inspector: D.Hickel
Result: Approved
Comment: The conforming entry is now complete. Please call before you come, as I may be at the hospital visiting a parishioner. Thank you so much! Requested by: Fr Vasili Hillhouse 503-709-2989 holytransfigurationanc@gmail.com Structural C.O. Approved

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
3/20/2014 FNLSANC house #'sInstall house numbers using contrasting colors. House numbers to be clearly visible from the street. install address at street
3/20/2014 FNLSBNC HandrailsHandrails to be 34" - 38" above the stairs measured at the nose of the stair in a plumb line complete handrails at all stairs
3/20/2014 FNLSCNC GuardrailsGuardrails to be 36" above finish floor. 4" maximum opening Complete guards as required
3/20/2014 FNLSGFinal Structural OtherPlease correct the following: Complete firestop above ceilings at all rated wall assemblies.
3/20/2014 FNLSGFinal Structural OtherPlease correct the following: Bathrooms per ANSI 117.1
3/20/2014 FNLSGFinal Structural OtherPlease correct the following: door 105 to be 90 min
ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS