Inspection #: 281030
Inspection Type: Electrical Rough
Inspector: O.Burbridge
Result: Partial
Comment: AM OR PM, BUT PM WOULD BE BETTER IF AVAILABLE. INSPECTION OF SWITCHGEAR AND PANELS IN MAIN ELECTRIC ROOM. Requested by: BILL HOBBINS 350-8395 BHOBBINS@ALCANELECTRIC.COM

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
1/9/2014Transfer15110. 26(A)(3) Working Clearance height<TABLE style="WIDTH: 345pt; BORDER-COLLAPSE: collapse" border=0 cellSpacing=0 cellPadding=0 width=460 x:str><FONT size=2>6ft-6in from floor or grade</FONT><BR> <TBODY></TBODY></TABLE>2nd floor electrical room:above H panel 
1/9/2014Transfer01See inspection comments Grid lines 1-12/ A-C 
1/9/2014Transfer19110. 26(F)(1)(a) DedIcated Space for electrical equipment<FONT size=2>Space equal to width and depth of equipment from floor to 6ft<SPAN style="mso-spacerun: yes">&nbsp; </SPAN>above equipment shall be dedicated to the electrical installation</FONT>Electrical room 1st Flooor:Panel A 
1/9/2014Transfer10110. 15 High-Leg Marking<P><FONT size=2>4-wire delta system: conductor having the higher voltage to ground must be marked orange</FONT> <BR></P>3rd floor electrical room:panel 3Bphases to new feeder not identified properly
1/9/2014Transfer5110. 11 Deteriorating AgentsNo use of conductors, equipment in damp or wet locations; in deteriorating gasses, fumes, vapors, etc; at excessive temps1st floor electrical room:underground service entrance conductors not approved for wet location 
1/9/2014TransferElecRoughOther000 Electrical Rough OtherPlease correct the following:Basement generator MDPequipment rated 1200 amps and 75" wide needs two egress doors