Click Here To View Another Inspection Inspection #: 276264 Inspection Type: Medical Gas Rough Inspector: H8 Result: Partial Comment: 2" u.g oxygen piping from plant to building Requested by: Brian Smith 354-0328 bdsmith@mtaonline.net 1st portion 24 hour test of underground 2" oxygen line from building tie in to new tank location: 10:10 AM - O2 = 200 psi Inspection Corrections DateStatusCodeDescriptionRefLocationComments