Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To View Another Inspection


Inspection #: 236554
Inspection Type: Undergound Electrical
Inspector: H8
Result: Partial
Comment: Requesting inspection as early as possible in AM. Concrete pour scheduled for slab on deck in A.M. Requested by: Bill Hobbins 350-8395 bhobbins@alcanelectric.com Slab conduits in balcony area A mechanical room and concessions area.

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
4/9/2013Transfer1090. 4 Special Permission<FONT size=2>AHJ's ability to waive specific requirements of NEC where equivalent objectives and safety can be maintained.</FONT>111:222333
4/9/2013Transfer1090. 4 Special Permission<FONT size=2>AHJ's ability to waive specific requirements of NEC where equivalent objectives and safety can be maintained.</FONT>11:2266
3/29/2013Transfer10110. 15 High-Leg Marking<P><FONT size=2>4-wire delta system: conductor having the higher voltage to ground must be marked orange</FONT> <BR></P>location field, correction page:LoC info fiels, correction pagecommens, correction page
3/29/2013Transfer13110. 26(A)(1) WorkClear: Depth<FONT size=2>0-150V: 3'.151-600V condition 1: 3'. 151-600V condition 2: 3'-6". 151-600V condition 3: 4'</FONT>3-29a:3-29b3-29c
ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS