Inspection #: 229921
Inspection Type: Final Electrical
Inspector: V.Fosberg
Result: Approved
Comment: Victor, Tried to schedule inspection at 5:40 today but system would nt let me. However, Lamp tube protection has been installed to fixtures as we discussed. Other items from previous inspections have been corrected. Requested by: Alan Larson 360-7918 alan@transnorthern.com

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
2/22/2013 EF1Correct Below Service, panels.1-line changes need to be aknowlegeded by engineer in the form of a field change order. Submit to MOA plan review.
2/22/2013 EF1Correct Below Hangar lighting.What is the tallest airplane that can fit through the 18'h x 60' w hangar door. Lights are 20' abv floor. 10 ft abv fuel tanks and engines req. to have open bulb fixt.
2/22/2013 EF1Correct Below OfficeChange of door location from office to hangar changes hazardous locations from dwg. Engineer needs to submit a change to MOA plan review.
2/22/2013 EF1Correct Below Mech roomDouble nipple RIB needed for control wiring.