Click Here To View Another Inspection Inspection #: 228261 Inspection Type: Final Mechanical Inspector: Result: Correction Comment: The alterations on the drain lines have been made per your request and the refrigeration systems are finished. All Mechanical work on the refrigeration units have been finalized and ready for inspection. A letter of completion and compliance is at the location taped to the walk in cooler door. This inspection request is for a Final Refrigeration only, there was not an option for Final Refrigeration so I checked Final Mechanical. Thank you Requested by: David Wolfe 907-315-2963 wolferef@mtaonline.net Inspection Corrections DateStatusCodeDescriptionRefLocationComments