| Date | Status | Code | Description | Ref | Location | Comments |
| 1/31/2013 | Transfer | EF1 | Correct Below | | thoroughout | Employees may not occupy workspaces until a certificate of occupancy or conditional certificate of occupancy is issued |
| 1/31/2013 | Transfer | EF1 | Correct Below | | 2nd floor | allreceptacles must have final inspection before modular furniture is installed |
| 1/31/2013 | Transfer | EF1 | Correct Below | | 2nd floor | ceiling inspectioin required where modular walls are ceiling fed |
| 1/31/2013 | Transfer | EF1 | Correct Below | | 2nd floor | modular walls must be listed assemblies or be installed per NEC (support for flexible metala conduit |
| 1/31/2013 | Transfer | EF1 | Correct Below | | breakroom | GFI receptacles for vending machines need to be readily accessible |