Inspection #: 227244
Inspection Type: Final Electrical
Inspector: V.Fosberg
Result: Cancel
Comment: Change Order issued per last inspection comments. RIB changed out Requested by: Alan Larson 907-360-7918 alan@transnorthern.com

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
2/12/2013TransferEF1Correct Below Service, panels.1-line changes need to be aknowlegeded by engineer in the form of a field change order. Submit to MOA plan review.
2/12/2013TransferEF1Correct Below Hangar lighting.What is the tallest airplane that can fit through the 18'h x 60' w hangar door. Lights are 20' abv floor. 10 ft abv fuel tanks and engines req. to have open bulb fixt.
2/12/2013TransferEF1Correct Below OfficeChange of door location from office to hangar changes hazardous locations from dwg. Engineer needs to submit a change to MOA plan review.
2/12/2013TransferEF1Correct Below Mech roomDouble nipple RIB needed for control wiring.