| Date | Status | Code | Description | Ref | Location | Comments |
| 1/28/2013 | Transfer | EF1 | Correct Below | | Service, panels. | 1-line changes need to be aknowlegeded by engineer in the form of a field change order. Submit to MOA plan review. |
| 1/28/2013 | Transfer | EF1 | Correct Below | | Hangar lighting. | What is the tallest airplane that can fit through the 18'h x 60' w hangar door. Lights are 20' abv floor. 10 ft abv fuel tanks and engines req. to have open bulb fixt. |
| 1/28/2013 | Transfer | EF1 | Correct Below | | Office | Change of door location from office to hangar changes hazardous locations from dwg. Engineer needs to submit a change to MOA plan review. |
| 1/28/2013 | Transfer | EF1 | Correct Below | | Mech room | Double nipple RIB needed for control wiring. |