Click Here To View Another Inspection Inspection #: 220630 Inspection Type: Rebar Inspector: P.Calhoun Result: Partial Comment: Requesting a 2:30PM inspection for CMU rebar to grout. Requested by: Bob Brandt 229-1444 rbrandt@neeserinc.com Inspection Corrections DateStatusCodeDescriptionRefLocationComments