Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To View Another Inspection


Inspection #: 210164
Inspection Type: Undergound Electrical
Inspector: H8
Result: Partial
Comment: Requested by: Bill Hobbins 350-8395 bhobbins@alcanelectric.com 1. Elevator pit M-4: 3/0 CU GEC cadwelded to elevator casing and run through slab to col M-4. 2. #3/0 CU GEC from col F-2 to MDP underslab. 3. Short GRC stubs into lift station LS-1. Same at LS-2. 4.Hydro pit control conduits at south end of pit: short conduit runs to panel OSD2. NOTE: GEC's run to MDP in bsmt. Is this where the main service OCPD is located?

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
       
ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS