| Date | Status | Code | Description | Ref | Location | Comments |
| 7/31/2012 | Transfer | EF1 | Correct Below | | Boiler room | Controller for pumps 4, 5 and 11 are too big. Controollers only suitable for 6amps or more and pumps are rated less that 3 amps. |
| 7/31/2012 | Transfer | EF1 | Correct Below | | In server room | Outlets for server racks are not yet installed. |
| 7/31/2012 | Transfer | EF1 | Correct Below | | Boiler room | Pumps 9 and 11 do not appear to have a third parts liisting. |
| 7/31/2012 | Transfer | EF1 | Correct Below | | Pod B | cord installed for scale not permitted inside wall |
| 7/31/2012 | Transfer | EF1 | Correct Below | | Boiler room | Some disconnects/motor controllers need bonnding bushings at knockouts. |
| 7/31/2012 | Transfer | ElecRoughOther | 000 Electrical Rough Other | Please correct the following: | Provide latest approved dwgs/change orders | |
| 7/31/2012 | Transfer | ElecRoughOther | 000 Electrical Rough Other | Please correct the following: | Genset shown on dwgs as 1200A. Actual installation is 800A genset. MDP load calc is over 900A. Dwgs need to doccument solution. | |
| 7/31/2012 | Transfer | ElecRoughOther | 000 Electrical Rough Other | Please correct the following: | | |
| 7/31/2012 | Transfer | ElecRoughOther | 000 Electrical Rough Other | Please correct the following: | Verify 4-pole ATS. (genset gnd and neut. bonded) | |
| 7/31/2012 | Transfer | ElecRoughOther | 000 Electrical Rough Other | Please correct the following: | Verify GFP service disconnect in ATS. | |
| 7/31/2012 | Transfer | ElecRoughOther | 000 Electrical Rough Other | Please correct the following: | Check 110.26 working clearances for 1st fl electric room. | |
| 7/31/2012 | Transfer | ElecRoughOther | 000 Electrical Rough Other | Please correct the following: | Do approved dwgs show genset as Art. 702? | |