Click Here To View Another Inspection Inspection #: 115079 Inspection Type: Private Development Site Civil Inspector: J.Day Result: Partial Comment: No CCO or CO until all driveways, traffic ways and drainage elements of the approved plans have been verified to have been completed. Provide a schedule to Pam Ronning prior to commencing work. Provide 24 hours advanced notice for inspection by contacting: Pam Ronning at 764-9267 or 343-8296. 5-20-11 Foundation work being done. Material stockpiled on site is uncovered. Silts were being carried off site by the wind. Mentioned to the contractor about watering the site, he agreed. The ditches along Business Blvd have been graded north of the construction entrance and culverts installed . The south entrance with culvert was not draining and needs to be regarded. Slopes have been seeded to stabilize. 5-26-11 Hickle Construction working on the building foundations. Stock piled material not covered, not leaving site today as there was no wind. Ditches along Business Blvd have standing water, detention area complete. Time 1.0 Inspection Corrections DateStatusCodeDescriptionRefLocationComments