Permit Number: C21-1153
Permit Type: Commercial Building Permit - None BldgNew
Address: W 160 48TH AVE Anchorage
Location: 160 W 48th Ave
Work Description: EPLANS-117094 SQFT, TYPE VB, OCCUPANCY R-1-GJS
NO CCO ON THIS PERMIT UNTIL SHARED ACCESS WITH C15-1806 IS RESOLVED. JCA 6/19/23
**REVOKED MAIN PERMIT AND ISSUED CORE AND SHELL ONLY PER JUDY 6/19/23 - SEE HER COMMENTS UNDER PD CIVIL REVIEW - BWP**
Change order X22-1625 has been approved and this permit (C21-1153) has full PD Civil approval.  - RDO (Per PDCivil Final Review)
Status: Issued
Project Name: EPLANS- CANDLEWOOD SUITES/HOLIDAY INN EXPRESS
Review Type: Mechanical
Result: Correction
Result Date: 9/30/2021 3:17:15 PM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

178
5
Mechanical
Leigh Bergstrom
9/24/21 2:27 PM
Changemark
MECH-1
DUCTS CONNECTING BOTH PUBLIC AREAS AND PRIVATE FOR THE HRU-101 SYSTEM ARE AREAS SEPARATED BY 1-HOUR CONSTRUCTION AND REQUIRE DAMPERS TO HAVE THE ABILITY TO ISOLATE ONE AREA FROM THE OTHER. EITHER KEEP THE DUCTING AS IS AND PROVIDE SMOKE DAMPERS AT EVERY RATED WALL PENETRATION (IMC 607.5.4) OR PROVIDE ONE SUPPLY BRANCH FOR THE COMMON AREAS, ONE SUPPLY FOR THE PRIVATE AREAS, ONE EXHAUST BRANCH FOR THE COMMON AREAS AND ONE EXHAUST BRANCH FOR THE PRIVATE AREAS. THIS SHOULD ALLOW ONE SUPPLY SMOKE DAMPER AND ONE EXHAUST SMOKE DAMPER TO MAINTAIN THE SEPARATION.
M4.0.pdf
 
Unresolved
179
5
Mechanical
Leigh Bergstrom
9/24/21 2:27 PM
Changemark
MECH-2
FD-108 & FD-109 ARE NOT REQUIRED SINCE A 1-HOUR SEPARATION IS NOT REQUIRED BETWEEN THE TWO ROOMS.
M4.0.pdf
 
Unresolved
180
5
Mechanical
Leigh Bergstrom
9/24/21 2:27 PM
Changemark
MECH-3
PLEASE CLARIFY THE LAST DIGIT OF THESE THREE FIRE DAMPERS.
M4.0.pdf
 
Unresolved
181
5
Mechanical
Leigh Bergstrom
9/24/21 2:28 PM
Changemark
MECH-4
PLEASE CLARIFY SHEET NOTE #5.
M4.0.pdf
 
Unresolved
182
5
Mechanical
Leigh Bergstrom
9/24/21 2:28 PM
Changemark
MECH-5
PLEASE CLARIFY SHEET NOTE #1 FOR THE MECH ROOM. ALL FIRE/SMODE DAMPERS IN THIS ROOM ARE PENETRATING THE BOTTOM OF A SHAFT, NOT A WALL.
M4.0.pdf
 
Unresolved
183
5
Mechanical
Leigh Bergstrom
9/24/21 2:28 PM
Changemark
MECH-6
PLEASE CLARIFY SHEET NOTE #1 FOR THE BOILER ROOM. THERE DOES NOT APPEAR TO BE ANY FIRE/SMOKE DAMPERS IN THIS ROOM.
M4.0.pdf
 
Unresolved
184
5
Mechanical
Leigh Bergstrom
9/24/21 2:28 PM
Changemark
MECH-7
A SMOKE DAMPER IS REQUIRED FOR THE DUCT PENETRATION OF THE BRANCH SERVING THE HALLWAY SUPPLY DIFFUSER. (IMC 607.5.4)
M4.0.pdf
 
Unresolved
185
5
Mechanical
Leigh Bergstrom
9/27/21 4:08 PM
Changemark
MECH-8
PLEASE CLARIFY WHAT DUCTED SYSTEM IS PENETRATING THE BOTTOM OF A SHAFT FOR SD104.
M4.0.pdf
 
Unresolved
186
5
Mechanical
Leigh Bergstrom
9/27/21 4:29 PM
Changemark
MECH-1
DUCTS CONNECTING BOTH PUBLIC AREAS AND PRIVATE FOR THE HRU-101 SYSTEM ARE AREAS SEPARATED BY 1-HOUR CONSTRUCTION AND REQUIRE DAMPERS TO HAVE THE ABILITY TO ISOLATE ONE AREA FROM THE OTHER. EITHER KEEP THE DUCTING AS IS AND PROVIDE SMOKE DAMPERS AT EVERY RATED WALL PENETRATION (IMC 607.5.4) OR PROVIDE ONE SUPPLY BRANCH FOR THE COMMON AREAS, ONE SUPPLY FOR THE PRIVATE AREAS, ONE EXHAUST BRANCH FOR THE COMMON AREAS AND ONE EXHAUST BRANCH FOR THE PRIVATE AREAS. THIS SHOULD ALLOW ONE SUPPLY SMOKE DAMPER AND ONE EXHAUST SMOKE DAMPER TO MAINTAIN THE SEPARATION.
M4.1.pdf
 
Unresolved
187
5
Mechanical
Leigh Bergstrom
9/30/21 10:45 AM
Changemark
MECH-1
A SMOKE DAMPER IS REQUIRED FOR THE DUCT PENETRATION OF THE BRANCH SERVING THE HALLWAY SUPPLY DIFFUSER (TYPICAL OF 5) (IMC 607.5.4)
M4.2.pdf
 
Unresolved
188
5
Mechanical
Leigh Bergstrom
9/30/21 11:20 AM
Changemark
MECH-2
A SMOKE DAMPER IS REQUIRED FOR THE DUCT PENETRATION OF THE BRANCH SERVING THE HALLWAY SUPPLY DIFFUSER. (IMC 607.5.4)
M4.2.pdf
 
Unresolved
189
5
Mechanical
Leigh Bergstrom
9/30/21 11:24 AM
Changemark
MECH-3
THESE THREE FIRE DAMPERS ARE NOT REQUIRED SINCE THE ONLY OUTLETS INTO THE CORRIDORS ARE TO BE PROTECTED WITH SMOKE DAMPERS.
M4.2.pdf
 
Unresolved
190
5
Structural
David Misiuk
9/30/21 12:47 PM
Changemark
Struc 43
The calculations call out HSS6x6x1/4 columns; please revise.
S2.0B.pdf
 
Unresolved
191
5
Mechanical
Leigh Bergstrom
9/30/21 1:43 PM
Changemark
MECH-1
WE BELIEVE THAT THIS DIFFUSER IS REDUNDANT AND WAS MEANT TO BE REMOVED FROM THIS CURRENT VERSION. WOULD THAT BE CORRECT?
M4.3.pdf
 
Unresolved
192
5
Mechanical
Leigh Bergstrom
9/30/21 1:43 PM
Changemark
MECH-2
A SMOKE DAMPER IS REQUIRED FOR THE DUCT PENETRATION OF THE BRANCH SERVING THE HALLWAY SUPPLY DIFFUSER. (TYPICAL OF 6) (IMC 607.5.4)
M4.3.pdf
 
Unresolved
193
5
Mechanical
Leigh Bergstrom
9/30/21 1:46 PM
Changemark
MECH-3
THESE THREE FIRE DAMPERS ARE NOT REQUIRED SINCE THE ONLY OUTLETS INTO THE CORRIDORS ARE TO BE PROTECTED WITH SMOKE DAMPERS.
M4.3.pdf
 
Unresolved
194
5
Mechanical
Leigh Bergstrom
9/30/21 1:49 PM
Changemark
MECH-1
THESE THREE FIRE DAMPERS ARE NOT REQUIRED SINCE THE ONLY OUTLETS INTO THE CORRIDORS ARE TO BE PROTECTED WITH SMOKE DAMPERS.
M4.4.pdf
 
Unresolved
195
5
Mechanical
Leigh Bergstrom
9/30/21 1:52 PM
Changemark
MECH-2
A SMOKE DAMPER IS REQUIRED FOR THE DUCT PENETRATION OF THE BRANCH SERVING THE HALLWAY SUPPLY DIFFUSER. (TYPICAL OF 6) (IMC 607.5.4)
M4.4.pdf
 
Unresolved
196
5
Mechanical
Leigh Bergstrom
9/30/21 1:58 PM
Changemark
MECH-1
A SMOKE DAMPER IS REQUIRED FOR THE DUCT PENETRATION OF THE BRANCH SERVING THE HALLWAY SUPPLY DIFFUSER. (IMC 607.5.4)
M4.6.pdf
 
Unresolved
197
5
Mechanical
Leigh Bergstrom
9/30/21 2:00 PM
Changemark
MECH-2
THESE THREE FIRE DAMPERS ARE NOT REQUIRED SINCE THE ONLY OUTLETS INTO THE CORRIDORS ARE TO BE PROTECTED WITH SMOKE DAMPERS.
M4.6.pdf
 
Unresolved
198
5
Mechanical
Leigh Bergstrom
9/30/21 2:22 PM
Changemark
MECH-1
THE COMMENTS MADE ON M4.6 ALSO APPLY HERE.
M4.7.pdf
 
Unresolved
199
5
Structural
David Misiuk
9/30/21 2:40 PM
Comment
Please reload all structural drawings in ePlans with clean, un-editable PDF files. The drawings currently contain text attributes that are incompatible with the ePlans system.
  
Unresolved
200
5
Mechanical
Leigh Bergstrom
9/30/21 2:51 PM
Changemark
MECH-1
THESE TWO SHAFT PENETRATIONS REQUIRE FIRE/SMOKE DAMPERS PER IMC 607.5.5.
M4.8.pdf
201
5
Mechanical
Leigh Bergstrom
9/30/21 2:51 PM
Changemark
MECH-2
THIS CORRIDOR VENTILATION DETAIL (SHEET NOTE #2) APPEARS TO BE IN THE WRONG LOCATION.
M4.8.pdf
 
Unresolved
202
5
Mechanical
Leigh Bergstrom
9/30/21 2:51 PM
Changemark
MECH-3
THE EIGHT LOCATIONS SHOWN FOR SHEET NOTE #2 REQUIRE SMOKE DAMPERS PER IMC 607.5.4 (NOT FIRE DAMPERS).
M4.8.pdf
 
Unresolved
203
5
Mechanical
Leigh Bergstrom
9/30/21 2:51 PM
Changemark
MECH-4
ALL OF THE SUPPLY AND EXHAUST DUCT PENETRATIONS OF THE SLEEPING UNITS (ALL FLOORS AND BOTH WINGS) REQUIRE NO FIRE DAMPERS. (IMC 607.5.4 EXCEPTION #3 APPLIES SINCE THE OPENINGS INTO THE CORRIDOR WILL BE PROTECTED WITH SMOKE DAMPERS.)
M4.8.pdf
 
Unresolved
204
5
Mechanical
Leigh Bergstrom
9/30/21 3:07 PM
Comment
MY APOLOGIES FOR INCORRECTLY STATING IN MECHANICAL COMMENT #154 THAT A FIRE DAMPER WAS REQUIRED FOR THE SUPPLY DUCTS TO THE CORRIDORS WHEN I SHOULD HAVE INDICATED A SMOKE DAMPER PER IMC 607.5.4.
  
Unresolved
205
5
Mechanical
Leigh Bergstrom
9/30/21 3:12 PM
Changemark
MECH-1
PLEASE PROVIDE A SYMBOL FOR A SMOKE DAMPER UNLESS PROVIDING FIRE/SMOKE DAMPERS WHERE ONLY SMOKE DAMPERS ARE REQUIRED. PLEASE CLARIFY.