Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To Go Back To Permit Information

Permit Number: C11-1609
Permit Type: Commercial Building Permit - None BldgAlter
Address: E 800 DIMOND BLVD Anchorage
Location:
Work Description: 1,998 sq ft add'n & T/I / tb **9/28/2012 (10) additional inspections paid**tb
Status: Closed
Project Name: OLIVE GARDEN
Review Type: Structural
Result: Approved
Result Date: 9/8/2011 10:48:47 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

PERMIT INFORMATION

Permit Number: C11-1609

Project Name: Olive Garden – Dimond Center

Permit Manager: Tony Barganier | ph: (907) 343-8339 | barganierta@muni.org

 

Plan Review: Mark Panilo | ph: (907) 343-8081  fax: (907) 249-7679 | panilomm@muni.org

 

Please submit all information through your Permit Manager.

 

REVIEW STATUS

08/15/2011 – Initial review (280133).  Comments issued.

09/08/2011 – Reviewed responses (282398).  Approved.

 

GENERAL

This review is code compliance review based on the requirements of the International Existing Building Code (IEBC), 2006 Edition, and all adopted references thereto, as amended by the Municipality of Anchorage in Anchorage Municipal Code (AMC) Title 23.  This review does not permit the violation of the building codes, nor any federal, state, or municipal regulation.

 

The following comments must be addressed before a permit may be issued.  Additional comments may be issued following review of submitted information.


1. FREQUENCY OF INSPECTIONS
Please note in the Statement of Special Inspections the required frequency of inspections (continuous vs. periodic).  Not all inspections noted show the frequency.

Reference:  IBC Section 1705.2

 

9/8/11 – Resolved.  Revised special inspection frequency provided.  MMP

 

2. SPECIAL INSPECTION PERSONNEL

Please provide a letter from the Owner/Owner's Representative, or Special Inspection Agency stating that the Special Inspection Agency has been retained by the Owner to provide special inspection services for the project as required by IBC Chapter 17.

Reference: AMC 23.15.1704.1.4

 

9/8/11 – Resolved.  Letter provided by Owner.  MMP

 

3. STEEL FABRICATOR QUALIFICATIONS

Please provide a copy of the steel fabricator certification from AISC, IAS, or MOA for fabrication of structural steel without special inspection required by IBC Chapter 17.  In lieu of certification, please submit the name(s) and resume(s) of the individual(s) providing shop special inspection for review.

Reference:  IBC Section 1704.2.2; AMC 23.15.1704.1.4

 

9/8/11 – Resolved.  Item has been deferred; noted by Plan Review.  MMP

 

4. DRAG STRUTS AT HIGH ROOF

Refer to Sheet S3.2, Details 13/ and 14/S4.3.  It is assumed that the gusset shown on Detail 13/S4.3 is how the loads are transferred down to the elevation of the low roof.  There are no calculations addressing potential gusset buckling (calculations show the demands on the drag as 13.75 k).  In addition, based on the provided detailing, it would seem that the roof diaphragm would rotate about the bottom thru-bolt connection and load the top of the wall with the full shear demand.  This would severely overload the anchors (note: Kwik Bolt TZ anchors are not listed for use in masonry) at the top, as well as cause out-of-plane bending in the masonry.  Please clarify design, and provide calculations and revised details as necessary.

Reference:  IBC Section 1604.4; ASCE 7 Section 12.10.2; AISC 360 Section Chapter E, J

 

9/8/11 – Resolved.  Revised gusset and anchorage design provided.  MMP

 

5. ANCHOR ROD CONFINEMENT

Refer to Sheet S4.1.  Please clarify the location of the top (3) #3 ties.  Without a limiting cover from the top of the pier, the bottom tie could be located more than 5 in. below the top of the pier.

Reference:  IBC Section 1603.1; ACI 318 Section 7.10.5.6

 

9/8/11 – Resolved.  Limiting cover shown only on one detail; is assumed this will govern all construction as a general detail.  MMP

 

6. LIGHT-GAGE STUD DESIGN

Refer to Sheet S4.4. The plans note light-gage stud framing for the new roof, including parapets.  The design, however, does not address whether stiffeners will be required at the bearing points, especially at the roof elevation.  Please clarify the design, and provide revised details as necessary.

Reference:  AISI S100 Section C3.7

 

9/8/11 – Resolved.  Revised design and details provided.  MMP

 

7. JOIST REINFORCING DETAIL CLARIFICATION

Refer to Details 9/ and 10/S4.4.  Detail 9 references Detail 10 for the 3/16 in. plate, but Detail 10 has no information regarding this.  Please clarify the reinforcing and welding requirements.

Reference:  AMC 23.10.104.8.1

 

9/8/11 – Resolved.  Revised details showing reinforcing and welding requirements.  MMP

ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS