Date | Status | Code | Description | Ref | Location | Comments |
5/24/2017 | | 01 | See inspection comments | | Low volt wiring req'd to be supported in area. Much of which appears to be going through to next unit. | |
5/24/2017 | | 01 | See inspection comments | | Access req'd to water connection for seperately derived system. | |
5/24/2017 | | 01 | See inspection comments | | Equipment ground req'd for xfmr to enclosure. | |
5/24/2017 | | 01 | See inspection comments | | Support for MC cable near store front. | |
5/24/2017 | | 01 | See inspection comments | | Seismic support and attach luminaire to grid at right rear of area. | |
5/24/2017 | | 01 | See inspection comments | | Open jbox at rear of area. | |
5/24/2017 | | 01 | See inspection comments | | Remove temp lighting from above accessible ceiling. | |